XM2001 Crusader Guide, Meaning , Facts, Information and Description
The XM2001 Crusader was to be the United States Army's next generation self-propelled howitzer, designed to provide significant increases in artillery survivability, lethality, mobility, and operational effectiveness. In early May 2002, United States Secretary of Defense Donald Rumsfeld cancelled the US$11 billion program due to it not being considered sufficiently mobile nor precise enough for modern requirements, although some military analysts dispute this.The Crusader was intended to displace the M109A6 Paladin Self-Propelled Howitzer and the M992A2 Field Artillery Ammunition Supply Vehicle (FAASV). Crusader is a fully automated cannon artillery system to support the Initial Brigade Combat Teams (IBCT) Counterattack Corps and is a critical technology enabler for future systems.
In addition to strategic deployability (two howitzers transportable in the C-17 Globemaster), other key features of the Crusader included:
- the XM297E2 integral mid-wall cooled cannon that enables sustained high rates of fire;
- a reliable, fully automated ammunition handling and loading system designed to use the modular artillery charge system and automatic inductively set multi-option fuze;
- a state-of-the-art cockpit with embedded command and control that allows the crew to exploit the system's full battle capabilities;
- embedded training and diagnostics to facilitate skill retention and maintenance support;
- composite armor;
- a suite of survivability features to protect the soldier and the system; and
- the LV100-5 gas turbine engine (common with the Abrams tank) that provides the improved mobility to keep pace with the supported maneuver force.
| SPH | RSV-T | RSV-W | |
|---|---|---|---|
| Curb Weight | 40 tons | 36 tons | 33.3 tons |
| Length | 7.53 m | 7.53 m | 11.03 m |
| Width | 3.31 m | 3.31 m | 2.44 m |
| Height | 3.00 m | 3.00 m | 3.59 m |
| Cross-Country Mobility | 39-48 km/h | 39-48 km/h | 64 km/h |
| Armament | Cooled 155mm | none | none |
| Max Range | 40-50km (assisted) | ||
| Rate of Fire/Resupply | 10-12 rounds/min | 48 rounds/10.4min | 48 rounds/10.4min |
| Crew | 3 | 3 | 3 |
- Prime Contractors: United Defense, L.P. (Minneapolis, Minnesota)
- Foreign Counterpart: No known foreign counterpart
- Foreign Military Sales: None
- Program Status
- 1QFY95 Approved to commence program definition and risk reduction (PDRR) phase.
- 2QFY98 In-process review completed and manufacture of the PDRR prototype systems begun.
- 3QFY99 Delivered first RSV prototype.
- 2QFY00 Delivered first prototype howitzer SPH 1.
- 1QFY02 Successful preliminary design review.
- 1QFY02 More than 4000 rounds fired from SPH 1.
- 2QFY02 Program cancelled.
- Projected Activities
- 2QFY03 Milestone B scheduled.
- 2QFY06 Milestone C scheduled.
- 3QFY08 First unit equipped.